CONSTRUCTION STAGE 2

OKO HAUSEN
Construction Stage 2

 We’ve begun work on the floating slab, a key step that ensures stability and efficiency in the structure.
This home stands out not only for its smart design but for its exceptional location: nestled in the heart of the forest, surrounded by peace, nature, and fresh air. 🌿🏡
Thanks to the ICF system, we build with speed, cleanliness, and precision, all while respecting the environment and embracing sustainable living.

Comments (1)

ovjyivmqnpexrjlmdeesizndglijhd

Leave a comment