CONSTRUCTION STAGE 12

OKO HAUSEN
Construction Stage 12

We’ve entered a new stage of the project: building the second-floor walls.
Thanks to the ICF construction system, we move forward with speed, precision, and a clean process.
Its versatility allows us to adapt the design seamlessly while ensuring a strong, efficient, and sustainable structure.
Each block lifted is one step closer to smart, conscious living.
The vision of Santa Ana Urbano is coming to life!

Leave a comment