Construction Stage 3

OKO HAUSEN
Construction Stage 3

In this phase of construction, we start placing the EPS blocks that will form the main walls and structures. This system allows for quick and efficient building, ensuring superior thermal insulation and a high level of comfort in the finished structure.

The use of EPS not only speeds up the construction process but also reinforces our commitment to a clean and sustainable worksite. The blocks integrate precisely into the design, minimizing material waste and optimizing the building’s energy efficiency. With these characteristics, we achieve a construction that respects the environment and offers a sustainable future for its occupants.